
Services
Construction project management and owner's representation in Prague
We represent the investor from the first sketch to the handover of a finished job. You get one contract, one phone number and one person accountable for the deadline and the budget — instead of eight contractors pointing at each other.
Most things that go wrong on a building site do not go wrong in the trades. They go wrong in the gaps between them. The electrician leaves before the tiler arrives. The drawing puts a socket where the wardrobe goes. The spring budget no longer matches the autumn invoices and nobody can explain why. Construction project management is the work that closes those gaps: preparation, permits, tendering, supervision, snagging and handover.
We are not a main contractor and we do not claim to be. We act for the owner. We prepare, lead, coordinate and take responsibility for the sequence holding together. We carry out the preparatory and finishing trades ourselves. Everything that requires a Czech construction licence is carried out by vetted, licensed contractors working under our coordination, and design documentation is produced and stamped by an authorised Czech designer, with structural design signed off by an authorised structural engineer.
The difference shows up the moment something goes wrong. On a fragmented job you ring four people in turn and each one blames the next. Here you ring once. Site meeting minutes, photographic records and signed schedules of work exist from day one, so the conversation is about numbers rather than impressions — which matters if you are managing the project from abroad.
What we actually do
We shape the scope around where you are. Some clients arrive with a plot and an idea, others with finished drawings and a need for supervision and a proper tender. You pay for the work we genuinely do.
- 01
Initial survey and a workable brief
We walk the property, check the condition of services, review the ownership declaration or Land Registry entry and listen to what you want. The output is a brief that can actually be priced: what is in, what is out, the target standard and a realistic budget ceiling. This is where the biggest savings are made — every change made later costs a multiple.
- 02
Coordinating the designer and technical disciplines
Architect, designer, structural engineer, mechanical and electrical services, ventilation and fire safety all have to draw against one brief. We chair coordination meetings, chase clashes and review the documentation for buildability and cost. The drawings are produced and stamped by an authorised designer; our job is making the disciplines agree on paper rather than on site.
- 03
Permits and dealing with the authorities
Acting under your power of attorney, we deal with the building authority, the statutory consultees and the utility operators. We obtain the binding opinions (public health, fire brigade, heritage, transport), file through the state building portal and run the case through to the decision. You sign one authorisation and receive status updates instead of queue tickets — useful if you do not speak Czech or do not live here.
- 04
Tendering and comparing bids properly
We invite several contractors to price the identical bill of quantities so the bids are genuinely comparable. Then we take them apart line by line: what has been left out, what is under-measured, what the payment terms, penalties and warranty periods actually say. The cheapest bid is usually the most expensive one, because the missing items still have to be built.
- 05
Budget control and variations
We keep one live budget showing the contract sum, spend to date and remaining contingency. Every variation comes with a written note: reason, price, effect on the programme, and your signature before the work starts. No approval, no variation, no payment.
- 06
Site supervision and site meetings
Regular site meetings with written minutes, photographs and named actions against dates. We inspect everything that is about to be covered up — services, insulation, falls, substrates — because once the tiles are on, nobody sees it again. Where Czech law requires supervision by an authorised person, we appoint one.
- 07
Snagging, final approval and handover
A formal takeover with a snagging list, deadlines for putting things right and a check that they were. We arrange the statutory inspections, test certificates, pressure tests and every document the authority wants to see. Where a use permit (kolaudace) is required, we run that process through to the decision.
- 08
As-built documentation and the handover file
You receive a file containing as-built drawings, test certificates, declarations of conformity, manuals, warranties and the contact details for every trade. Five years later, when you drill into a wall or make an insurance claim, you will be glad you know where the pipes and cables run.
Realistic timings, stage by stage
The ranges below apply to a typical Prague job — a flat refurbishment, a bathroom and services replacement or a small commercial unit. Stages overlap, so the total is not the sum of the parts.
Survey, brief and budget frame
1–2 weeks
Inspection, measured survey, condition check on services and structure, review of any restrictions in the ownership declaration or the owners' association rules. You finish knowing what is technically possible and roughly what it will cost.
Design and coordination of disciplines
3–8 weeks
The authorised designer produces the documentation while we chair coordination and chase clashes between disciplines. The longer end applies where a structural engineer is involved or the layout and utility connections change.
Permits and binding opinions
0–14 weeks
Zero where the work is internal alteration with no structural intervention and no change of use. The fast-track procedure for simple structures runs in weeks; the standard procedure takes longer. In practice the binding opinions of consultees eat more time than the authority's own decision.
Tender and building contract
2–4 weeks
Identical bills of quantities issued, bids collected, site visits with tenderers, a comparison table and negotiation of contract terms. Completion dates and liquidated damages are agreed here, not halfway through the build.
Construction under supervision
8–20 weeks
A full flat refurbishment normally sits in this range. Site meetings weekly, and more often at critical points such as first-fix services before they are covered and substrates before flooring.
Takeover, use permit, as-builts and handover
2–8 weeks
Takeover inspection, snagging, certificates and testing, as-built documentation. Where a use permit is required, expect the upper end — the authority works to its own statutory deadlines.
What it costs
In Prague this work is charged either as a percentage of the construction cost or as a fixed fee for a defined task. The percentage falls as the project grows, so larger budgets sit at the bottom of the range.
Permits and representation before the authorities
CZK 30,000 – 90,000, fixed fee
Power of attorney, dealings with the building authority, obtaining binding opinions from statutory consultees, electronic filing and case management through to the decision. The upper end applies in heritage zones, for a change of use, or where several consultees are involved. Statutory fees and design fees are not included.
Site supervision for the owner
1.5 – 3% of construction cost, from CZK 18,000 per month
Regular site meetings with minutes and photographs, inspection of work before it is covered up, sign-off of monthly valuations, budget monitoring and assessment of variations, attendance at takeover and verification that snags have been closed out.
Full service, brief to handover
4 – 8% of construction cost
Everything together: brief and preparation, coordination of the designer and technical disciplines, permits, tendering and contract negotiation, budget and variation control, site supervision, snagging, use permit, as-built documentation and the handover file. One contract, one line of accountability.
These are indicative Prague market ranges for 2026, not an offer. The final fee is set only after an inspection, a measured survey and an agreed scope, and it is written into the contract. Prices are quoted in Czech koruna; VAT and statutory fees are stated separately.
Open pricingThings that catch owners out
Variations appear when the walls come down, not at the end
Wiring from the 1980s, damp behind tiles, rot in a timber floor, a partition built from something other than what the drawings claim. In Prague's older stock a contingency of 10–15% of the budget is sensible. Anyone promising no variations either does not know the building or has hidden them in the price.
Touching a structural wall changes everything
An opening through a load-bearing wall or slab means a structural report, documentation from an authorised designer and a permit. It cannot be regularised afterwards with a single piece of paper, and it surfaces when you come to sell. Deal with it at the start, not when a neighbour complains.
The owners' association can move your programme and your price
Consent from the building's owners' association, permitted hours for noisy work, a ban on carrying rubble in the passenger lift, a deposit against damage to common parts, restricted access for vans. In the centre add a pavement occupation permit and its daily charge. Sorted out in advance this is admin; sorted out later it is a stopped site that you pay for.
The cheapest bid is rarely the cheapest job
The gap between bids is usually not margin — it is the demolition, waste removal, priming, grouting, testing and final clean that one of them left out. That is why every tenderer prices the same bill of quantities and why we compare line by line. Without that you are comparing two different buildings.
Change of use is a separate process
Turning an office or a studio unit into a dwelling is not a refurbishment question; it is a change-of-use procedure involving fire strategy, public health and daylight requirements. Without it the unit is not registered as a flat and a Czech bank will not lend against it. Establish this before you buy, not after.
No as-built documentation, no leverage
Plenty of refurbishments end with the work done and nobody knowing where the pipes and cables run. Years later that costs money on a drilling job or an insurance claim. Make as-built drawings and test certificates a condition of the final payment.
Frequently asked questions
What does construction project management include in the Czech Republic?
It covers representing the owner across the whole project: setting the brief, coordinating the designer and technical disciplines, obtaining the permit, tendering and appointing the contractor, controlling the budget and variations, supervising the site, snagging, the use permit and handover with full documentation. In short, everything around the building work, so your part is limited to decisions and signatures.
How much does site supervision cost in Prague?
In 2026 it typically runs between 1.5% and 3% of construction cost, or a monthly retainer from roughly CZK 18,000 on smaller jobs. The percentage falls as the budget rises. These are indicative ranges — the fee is fixed only after an inspection and an agreed scope.
Do I need planning permission to renovate a flat in Prague?
For a straightforward refurbishment that does not touch load-bearing structure, does not change the external appearance and does not change the use, a permit is usually not required. Once you remove a structural wall, alter the flat's layout as recorded in the ownership declaration, change the use, or work in a heritage-protected building, a permit is required. Which applies to your flat is a question for an inspection and the drawings, not a general answer.
How does the new Czech Building Act change permits?
The new Building Act replaced the old two-step process of a zoning decision followed by a building permit with a single permit for the project, and the separate notification procedure no longer exists. The closest equivalent today is the fast-track procedure for simple structures, available where consents, binding opinions and documentation are all complete at the point of filing. A defined group of minor works needs no permit at all.
How long does it take to get a building permit in Prague?
The authority's own decision takes weeks under the fast-track route and longer under the standard procedure. In practice the bigger part of the calendar goes on collecting binding opinions from consultees and utility operators before you file. For a typical Prague job, plan on several weeks to three months from instruction to a final decision.
Who is liable for defects if a subcontractor did the work?
It depends how the contracts are set up. If the owner holds separate contracts with each trade, each one is liable only for its own part and every dispute about the interface lands on the owner. We set the contracts up so that responsibility for each package and each deadline is written down, and we pursue defects on your behalf using the takeover records and photographs.
Is site supervision worth it on a flat refurbishment?
On a job worth hundreds of thousands or millions of koruna, usually yes. It pays for itself in two places: inspecting work before it is covered up, where mistakes are most expensive to undo, and challenging variations, where budgets quietly leak. If you cannot be on site weekly and read a valuation, supervision is cheaper than going without.
Can you manage a renovation for an owner living abroad?
Yes — that is a large part of why this service exists. You give a power of attorney, we deal with the authorities, the designer and the contractors, and you receive site meeting minutes, photographs and a live budget. We communicate in English and Czech, and the decisions that need you are put to you in writing with a price and a deadline attached.
Why use one partner instead of hiring eight trades directly?
Because with eight contracts you are the coordinator. You chase dates, you deal with the tiler who cannot start because the electrician has not finished, and you carry the risk when they blame each other. With one contract there is one point of contact, one budget and one person to ring when something does not add up.
Tell us about the project you are planning
Send us the scope, the address and your target date. We will come back to you, arrange an inspection and tell you plainly what is feasible, what will need a permit and what price range to plan for. Contact: Martin Guth, Commercial Director, +420 777 399 111. Building work requiring a Czech construction licence is carried out by vetted licensed contractors, and design documentation is prepared by an authorised designer.
Services
All services

Apartment renovation
A full renovation from strip-out to final clean, at a fixed price and on a fixed date.
Learn more
Apartment core renovation
Removing the prefabricated core, new services, and a masonry core built to fit.
Learn more
Bathroom renovation
Turnkey bathrooms — strip-out, services, tiling and fixtures.
Learn more
House renovation
Modernisation, extensions, insulation and new services for family homes.
Learn more
Property development
From land acquisition and planning consent through to the sale of units.
Learn more